HOW TO GET HERE

Daniels Spectrum is located at 585 Dundas Street East, on the south side of Dundas, just east of Parliament Street.

HOURS OF OPERATION

Monday 8am to 9pm
Tuesday 8am to 9pm
Wednesday 8am to 9pm
Thursday 8am to 9pm
Friday 8am to 9pm
Saturday 10am to 6pm
Sunday 10am to 6pm

When there is an event taking place, the building may be open earlier and close later than noted here. 
We are closed on the following statutory holidays: 
New Year’s Day, Family Day, Victoria Day, Canada Day, Civic Holiday, Labour Day, Thanksgiving, Christmas Day, Boxing Day

PARKING

Paid public parking is available in the underground lot beneath the Daniels Spectrum. The vehicle entrance is off the laneway to the south of the centre, accessible via Sackville Street just south of Dundas Street East.

Additional paid public parking can be found in an underground lot beneath the RBC Royal Bank, just north of Dundas Street East off Regent Street.

ADDRESS

Daniels Spectrum
585 Dundas Street East
Toronto, ON
M5A 2B7 
Canada

ACCESSIBILITY

  • The Dundas Street entrance provides barrier-free access to the building
  • Two elevators are located in the South Lobby
  • All floors have accessible washrooms and stalls, as well as accessible drinking fountains
  • Signage throughout the building is written in Braille
  • A hearing enhancement system is available in the Ada Slaight Hall

Artscape strives to provide equal treatment to and equitable benefits of its services, programs and facilities in a manner that respects the dignity and independence of people with disabilities. Read Artscape’s commitment to Accessible Customer Service in PDF.

ENVIRONMENTAL FEATURES

The building was designed to target Leadership in Energy & Environmental Design (LEED) Silver certification. Environmental and energy-efficient features include:

  • Green roof with native plant species
  • Bicycle parking and showers for staff who cycle to work
  • Car-share vehicle available in the commercial parking lot
  • Fuel-efficient hybrid car-share vehicle
  • Storm water treatment system to reduce pollutants
  • Low-maintenance landscape and low-flow fixtures to reduce water use
  • High-efficiency HVAC system that contains no hydrofluorocarbons
  • Recycled construction materials, including reclaimed wood from Regent Park
  • Low-VOC paint, carpeting and cabinetry used throughout the building
  • Controllable lights and thermostats